User's Guide
SLUU654A – October 2011 – Revised October 2011
bq25504 EVM – Ultra Low Power Boost Converter with
Battery Management for Energy Harvester Applications
This user’s guide describes the bq25504 evaluation module (EVM), how to perform a stand-alone
evaluation and allows the EVM to interface with the system and host. This EVM is programmed from the
factory for settings compatible with most MCU’s and 3V coin cell batteries. The EVM is programmed to
deliver a 3.1VDC maximum voltage (OV) for charging the storage element and the under voltage is
programmed to 2.2VDC. The VBAT_OK indicator toggles high when VSTOR ramps up to 2.8VDC and
toggles low when VSTOR ramps down to 2.4VDC.
1
2
3
4
5
Contents
Introduction .................................................................................................................. 2
1.1
EVM Features ...................................................................................................... 2
1.2
General Description ................................................................................................ 2
1.3
Design and Evaluation Considerations .......................................................................... 3
Performance Specification Summary ..................................................................................... 4
Test Summary ............................................................................................................... 4
3.1
Equipment ........................................................................................................... 4
3.2
Equipment and EVM Setup ....................................................................................... 4
3.3
Test procedures .................................................................................................... 5
PCB Layout Guideline .................................................................................................... 11
Bill of Materials, Board Layout and Schematics ....................................................................... 12
5.1
Bill of Materials .................................................................................................... 12
5.2
EVM Board Layout ............................................................................................... 13
5.3
EVM Schematic ................................................................................................... 15
List of Figures
1
Test Setup for HPA674A (bq25504 EVM) ............................................................................... 5
2
Startup with no Battery and 10k Load .................................................................................... 6
3
Startup with Battery Less Than UV ....................................................................................... 7
4
Powering up with a Battery above UV
5
6
7
8
9
10
11
...................................................................................
BAT_OK High/Low 2.8V/2.34V – Ramping Battery from 0V to 3.1V (OV) and Down to 1.8V. ...................
Basic Switching Converter, Vin = 1V, Vbat = 2.5V .....................................................................
EVM Operation Near OV With 100-Ω Battery Impedance ...........................................................
EVM PCB Top Assembly .................................................................................................
EVM PCB Top Layer .....................................................................................................
EVM PCB Bottom Layer ..................................................................................................
EVM Schematic ............................................................................................................
7
8
9
10
13
13
14
15
List of Tables
1
I/O Connections and Configuration for Evaluation of bq25504 EVM................................................. 4
2
Bill of Materials............................................................................................................. 12
SLUU654A – October 2011 – Revised October 2011
Submit Documentation Feedback
bq25504 EVM – Ultra Low Power Boost Converter with Battery Management for
Energy Harvester Applications
Copyright © 2011, Texas Instruments Incorporated
1
Introduction
1
Introduction
1.1
EVM Features
•
•
•
•
•
•
1.2
www.ti.com
Evaluation module for bq25504
Ultra low power boost converter/charger with battery management for energy harvester applications
Resistor-programmable settings for under voltage, over voltage providing flexible battery management;
POTs Included for fine tuning the settings (not populated)
Programmable push-pull output Indicator for battery status (VBAT_OK)
Test points for key signals available for testing purpose – easy probe hook-up.
Jumpers available – easy to change settings
General Description
The bq25504 is the first of a new family of intelligent integrated energy harvesting Nano-Power
management solutions that are well suited for meeting the special needs of ultra low power applications.
The product is specifically designed to efficiently acquire and manage the microwatts (µW) to miliwatts
(mW) of power generated from a variety of DC sources like photovoltaic (solar) or thermal electric
generators. The bq25504 is the first device of its kind to implement a highly efficient boost
converter/charger targeted toward products and systems, such as wireless sensor networks (WSN) which
have stringent power and operational demands. The design of the bq25504 starts with a DC-DC boost
converter/charger that requires only microwatts of power to begin operating. Once started, the boost
converter/charger can effectively extract power from low voltage output harvesters such as thermoelectric
generators (TEGs) or single / dual cell solar panels. The boost converter can be started with VIN as low
as 330 mV typ., and once started, can continue to harvest energy down to VIN ≃ 100 mV.
The bq25504 also implements a programmable maximum power point tracking (MPPT) sampling network
to optimize the transfer of power into the device. The MPP is listed by the harvesting manufacturer as a
percentage of its open circuit (OC) voltage. Typically solar cells are at their MPP when loaded to ~80% of
their OC voltage. The bq25504 periodically samples the open circuit input voltage by disabling the boost
converter (approximately every 16 seconds) and stores the programmed MPP ratio of the OC voltage on
the external reference capacitor, C5. If the storage element is less than the maximum voltage (OV) then
the boost converter will load the harvesting source until it reaches the MPP (C5 voltage reference) and
then regulate the input voltage of the converter, thus transferring the maximum amount of power to the
output. Alternatively, an external reference voltage can be provided, by a MCU to the REFS pin, to adjust
C5 independently. The shunt on JP1 has to be moved from the Divider setting to STOR when providing
this external reference (JP1-2 tied to JP1-1 – OSC/STOR).
The bq25504 was designed with the flexibility to support a variety of energy storage elements. The
availability of the sources from which harvesters extract their energy can often be sporadic or
time-varying. Systems will typically need some type of energy storage element, such as a re-chargeable
battery, super capacitor, or conventional capacitor. The storage element will make certain constant power
is available when needed for the systems. The storage element also allows the system to handle any peak
currents that can not directly come from the input source.
To prevent damage to a customer’s storage element, both maximum and minimum voltages are monitored
against the user programmed under-voltage (UV) and over-voltage (OV) levels.
To further assist users in the strict management of their energy budgets, the bq25504 toggles the battery
good flag to signal the microprocessor when the voltage on an energy storage element or capacitor has
dropped below a pre-set critical level. This should trigger the shedding of load currents to prevent the
system from entering an under voltage condition.
The OV, UV and battery good thresholds are programmed independently. The EVM has three 500KΩ
potentiometers (not installed at factory) to allow fine tuning of the three programmable thresholds. This
only need be done if the user needs precision, the POTs provide about ±50mV shift.
For details, see bq25504 data sheet (SLUSAH0).
2
bq25504 EVM – Ultra Low Power Boost Converter with Battery Management for SLUU654A – October 2011 – Revised October 2011
Energy Harvester Applications
Submit Documentation Feedback
Copyright © 2011, Texas Instruments Incorporated
Introduction
www.ti.com
1.3
Design and Evaluation Considerations
This user's guide is not a replacement for the data sheet. Reading the data sheet first will help in
understanding the operations and features of this IC. Be sure to make note of the capacitor selection
section when designing the EVM. Many of the IC's pin names start with a "V" and this "V" is removed on
the EVM connector's label. The names are interchangeable.
This IC is a highly efficient charger for a storage element such as a battery or super capacitor. In this
document, “battery” will be used but one could substitute any appropriate storage element. The main
difference between a battery and a super capacitor is the capacity curve. The battery typically has little or
no capacity below a certain voltage, where as the capacitor does have capacity at lower voltages.
In the lab when using a lab power supply rather than an energy harvester, one will have the output of the
lab supply, Vsource, followed by the harvester's impedance (about 20Ω) and connected to VIN of the EVM.
These two signals are separated by the 20Ω source impedance which represents the internal impedance
of the source. VIN is equal to VSource when there is no load (open circuit) and is pulled down to the MPPT
harvester threshold when the charger is able to deliver the maximum power before reaching OV.
The over voltage (OV) setting initially is lower than the programmed value at startup (varies on conditions)
and is updated after the first ~32ms. Subsequent updates are every ~64ms. The OV threshold is the
reference for maximum voltage on VSTOR and the boost converter will stop switching if the voltage on
VSTOR reaches the OV reference. The UV is checked every ~64ms to determine if the BAT FET should
be on or off. The open circuit (OC) input voltage is measured every ~16 seconds which is used to
calculate the Maximum Power Point Tracking (MPPT) threshold (programmed with resistors to 78% at the
factory). This periodic update continually optimizes maximum power delivery based on the harvesting
conditions.
Harvesting ultra low power energy requires a different mind set when designing a system. Often there is
not enough real time input harvested power to run the system in full operation so energy is collected over
a period of time, stored in a battery and then used periodically to power the system.
The designer needs to define a “Battery OK” threshold and battery discharged threshold (Not OK) to allow
successful system operation. The BAT_OK high/low threshold are programmed at the factory to 2.8V and
2.4V using resistors R7, R8, and R9. A BAT_OK high signal would typically indicate to the host that the
battery is above 2.8V and ready to use and if low would indicate that the cell is discharged such that the
system load should be reduced or disabled. The BAT_OK signal is checked every 64ms.
The quiescent current, which is basically the current from the battery to the IC, can be measured at the
STOR pin. To measure the current the user should connect a 100kΩ resistor to J5-2 (STOR) and connect
a 3V supply from the other end of this resistor to the ground of the EVM. A 10MΩ meter can be used to
measure the voltage drop across the resistor and calculate the current. No other connections should be
made to the EVM and the measurement should be taken after steady state conditions are reached (may
take a few minutes). The reading should be in the range of 375nA.
The battery (storage element) can be replaced with a simulated battery. Often electronic 4 quadrant loads
give erratic results with a “battery charger” due to the charger changing states (fast-charge to termination
and refresh) while the electronic load is changing loads to maintain the “battery” voltage. The charging and
loading get out of phase and creates a large signal oscillation which is due to the 4 quadrant meter. A
simple circuit can be used to simulate a battery and works well and can quickly be adjusted for voltage. It
consists of load resistor (~10Ω, 2W) to pull the output down to some minimum storage voltage (sinking
current part of battery) and a lab supply connected to the BAT pin via a diode. The lab supply biases up
the battery voltage to the desired level. It may be necessary to add more capacitance across R1.
D1
C
A
BAT+
R1
GND
SLUU654A – October 2011 – Revised October 2011
Submit Documentation Feedback
bq25504 EVM – Ultra Low Power Boost Converter with Battery Management for
Energy Harvester Applications
Copyright © 2011, Texas Instruments Incorporated
3
Performance Specification Summary
2
www.ti.com
Performance Specification Summary
See Data Sheet “Recommended Operating Conditions” for component adjustments. For details about the
resistor programmable settings, see bq25504 data sheet (SLUSAH0).
MIN
NOM
DC input voltage into VIN_DC
VIN_Start-up(DC)
DC minimum Start-up Voltage
VOV
Over Voltage – Sets maximum output voltage
2.9
3.1
3.3
V
VUV
Under voltage setting for shorting VSTOR to VBAT
2.1
2.2
2.3
V
VBAT_OK indication toggles high when VSTOR ramps up
2.65
2.8
2.95
V
VBAT_OK indication toggles low when VSTOR ramps down
2.25
2.4
2.55
V
330
MPPT
Maximum Power Point Tracking, Programmed % of Open Circuit Voltage
CBAT
Battery Pin Capacitance or equivalent battery capacity
3
Test Summary
3.1
Equipment
3.0
UNIT
VIN(DC)
VBAT_OK
0.13
MAX
V
mV
78%
100
µF
Power Supplies
Power Supply #1 (PS#1): Adjustable 5V Power supply with Current Limit of 100mA.
Power Supply #2 (PS#2): Adjustable 5V Power supply with 20Ω series impedance (can just be a discrete
resistor) with Current Limit of 100mA.
Loads
Load #1: 10kΩ, 5%, 0.25W resistor and 1kΩ, 5%, 0.25W resistor as per procedure P/S#2 series
resistance: 20Ω, 5%, 0.25W
Meters
Meter#1,2,3: Fluke 75 multi-meter, (equivalent or better) for voltage measurements
Scope
Standard scope with at least two channels
3.2
Equipment and EVM Setup
Table 1. I/O Connections and Configuration for Evaluation of bq25504 EVM
4
Jack
Description
Factory Setting
J1–VIN
Input Source (+)
J1–GND
Input Source Return (–)
J2–BAT
Battery connection (+)
J2–GND
Battery Connection Return (–)
J3 – VIN
Input Source Sense (+) [for J1]
J3 -GND
Input Source Return Sense (–) [for J1]
J4 – BAT_OK
Battery Status Indicator (+)
J4 - GND
Battery Status Indicator Return (–)
J5 – STOR
Charger Output (+)
J5 – GND
Charger Output Return (–)
J6 – STOR
Charger Output Sense (+)
J6 – BAT
Battery Connection Sense (+) [for J2]
J6 - GND
Battery Connection Sense (–) [for J2]
JP1
MPPT setting: Enabled-Divider; Disabled-STOR
Place Shunt on JP1-2/3 (Divider)
JP2
OCS Setting: C5 Capacitor-No Shunt; Disabled-Shunt on REF-GND
(JP1 should be Disabled)
No Shunt
bq25504 EVM – Ultra Low Power Boost Converter with Battery Management for
Energy Harvester Applications
SLUU654A – October 2011 – Revised October 2011
Submit Documentation Feedback
Copyright © 2011, Texas Instruments Incorporated
Test Summary
www.ti.com
Load # 1
_
Meter # 4
+
Meter # 2
-
+
Meter # 3
+
-
-
+
Meter # 1
P/S # 1
+
-
Jumper
Figure 1. Test Setup for HPA674A (bq25504 EVM)
3.3
3.3.1
Test procedures
Power-up With No Battery and 10kΩ Load on STOR
1. Connect a 20Ω resistor to J1-1, 10k resistor between J6-1 and J6-3 and place shunt on JP1-DIV.
Connect meters and scope probes to monitor CH1→CH4: VPHASE(TP16), VSTOR, VP/S #1, VBAT. Set scope
to 1V per division for each channel and 20ms/div, single sequence trigger on VP/S#1, see Figure 2.
2. Set PS#1 to 1VDC and hot plug to input with 20Ω series resistor.
This is an example of cold startup (VSTOR < 1.8V). The input power is harvested by the boost converter and
charges up to the initial OV setting, which is below the actual setting (pseudo softstart), the converter
stops switching and the load discharges the STOR capacitor. Note that if the load is too great with no
battery or a discharge battery the cold start may not be able to charge the battery. Therefore, it is
important to manage the load with a discharged or missing battery, using BAT_OK. The converter
continues to switch until VSTOR charges up to the OV threshold at 3.1V, the converter shuts off until VSTOR
drops 35 mV (hysteresis) below OV and then the converter switches on periodically to maintain the output
voltage. This is a similar operation to a hysteretic boost converter.
VPHASE is the inductor switching node.
SLUU654A – October 2011 – Revised October 2011
Submit Documentation Feedback
bq25504 EVM – Ultra Low Power Boost Converter with Battery Management for
Energy Harvester Applications
Copyright © 2011, Texas Instruments Incorporated
5
Test Summary
www.ti.com
Vstor
Vbat
Vphase
Vp/s#1
Figure 2. Startup with no Battery and 10k Load
3.3.2
Power-up with Battery less than UV (less than a diode drop below UV)
1. Same setup, as 3.3.1, except move the probe on VBAT to VIN and apply a charge element set to 1.9VDC
between BAT and GND. Arm scope to trigger on VP/S #1.
2. Set PS#1 to 1VDC and hot plug to input with 20Ω series resistor, see Figure 3.
The start up is similar to the case without the battery but after the initial ~40ms period the STOR charges
to 2.8V or ~0.9V above the battery and is charging the element via the BAT FET body diode. The next
sampling cycle for UV detects that the VSTOR is greater than UV (2.2V) and then turns on the BAT FET.
Since the battery is at 1.9V, VSTOR is pulled down to ~1.9V and the next UV sampling turns off the BAT
FET. The cycling continues until the battery gets charged to the UV threshold and then finally the BAT
FET stays on. A less complicated design would turn off the system load once the battery drops near the
UV threshold to avoid this cycling.
If the storage element is lower than the maximum voltage (OV) then the element can theoretically take all
of the available input power. As the harvesting source is loaded, its output voltage drops until reaching the
MPPT threshold, which is currently programmed to 78% of the OC voltage and then the boost converter
regulates the input voltage at this level by controlling the power transferred to the load. Note how Vin
regulates to 78% of P/S#1 when the battery is lower than the OV voltage. Vary the input voltage slightly
and wait for the 16 second update cycle to see how the MPPT is updated.
For a battery that is more than a diode drop below 1.8V, the charger may get stuck in cold startup which is
less efficient and would take longer to recover. Once the STOR voltage gets above 1.8V and more than
32ms after power is applied, the low power cold start circuit is disabled and the main boost converter
takes over.
6
bq25504 EVM – Ultra Low Power Boost Converter with Battery Management for SLUU654A – October 2011 – Revised October 2011
Energy Harvester Applications
Submit Documentation Feedback
Copyright © 2011, Texas Instruments Incorporated
Test Summary
www.ti.com
Vstor
Vin
Vp/s#1
Vphase
Figure 3. Startup with Battery Less Than UV
3.3.3
Power-up with Battery more than UV (2.3V to 3V), BAT FET ON
1. Same setup as 3.3.1, except change the charge element set to 2.4VDC between BAT and GND. Set
scope to 2sec/div and to roll.
2. Set PS#1 to 1VDC and hot plug to input with 10Ω series resistor, see Figure 4.
Note in Figure 4 that the BAT FET is on and the STOR output is powered prior to the input being applied.
This means the converter will start up in normal boost mode and after doing its initial sampling will
regulate VIN to the MPPT threshold.
Vstor
Vp/s#1
Vin
Vphase
Figure 4. Powering up with a Battery above UV
SLUU654A – October 2011 – Revised October 2011
Submit Documentation Feedback
bq25504 EVM – Ultra Low Power Boost Converter with Battery Management for
Energy Harvester Applications
Copyright © 2011, Texas Instruments Incorporated
7
Test Summary
3.3.4
www.ti.com
BAT_OK Indication as Battery Charges/Discharges
1. Connect scope probes CHI→CH4: VPHASE(TP16), VSTOR, VBAT_OK, VBAT and vary charge element from
zero voltage to 3.15V and back down to 1.8V and observe the BAT_OK signal.
Initially P/S#1 is set to 1V and the battery is adjusted to OV (simulated battery), which clamps VSTOR to
~0.5V (lower body diode drop due to lower current). As the battery voltage is swept higher one can see
the different phases discussed earlier. Once the output gets to ~2.8V the BAT_OK signal goes high. Note
that the BAT_OK signal goes low once the battery is discharged to ~2.34V.
This signal’s high and low threshold can be programmed by R7, R8 and R9 to give an indication to the
host when the battery is good (Signal high – has enough energy to complete the designed task) and when
the battery is discharged (Signal low – system needs to be disabled or low power mode so the battery can
recharge).
V_BAT-OK
Vstor Vbat
Vphase
Figure 5. BAT_OK High/Low 2.8V/2.34V – Ramping Battery from 0V to 3.1V (OV) and Down to 1.8V.
3.3.5
Basic PFM Switching Waveform, Vin = 1V, Vbat = 2.5V
1. Set up scope as follows: CHI→CH4: VPHASE(TP16), VSTOR, VP/S #1, VIN, 10µs/DIV.
8
bq25504 EVM – Ultra Low Power Boost Converter with Battery Management for SLUU654A – October 2011 – Revised October 2011
Energy Harvester Applications
Submit Documentation Feedback
Copyright © 2011, Texas Instruments Incorporated
Test Summary
www.ti.com
Vstor
Vsource
Vin
Vphase
Figure 6. Basic Switching Converter, Vin = 1V, Vbat = 2.5V
Note here that VIN is regulating at the MPPT threshold so the boost circuit is delivering the maximum
power that the source can deliver. The user can see after about 4 pulses that the switching waveforms
stops which cause the inductor to go discontinuous and ring.
SLUU654A – October 2011 – Revised October 2011
Submit Documentation Feedback
bq25504 EVM – Ultra Low Power Boost Converter with Battery Management for
Energy Harvester Applications
Copyright © 2011, Texas Instruments Incorporated
9
Test Summary
3.3.6
www.ti.com
Operation Near OV With 100-Ω Battery Impedance
1. Connect scope probes CHI→CH4: VPH(TP16), VSTOR, VIN, VBAT; set VP/S#1 to 1.3 VDC and VBAT to 3.00
VDC. Connect the power sources with their respective source impedance to the EVM. VIN source
impedance should be 20Ω and the battery impedance should be 100Ω. Set VSTOR and VBAT to
20mVDC/div and 3.135VDC offset (3.135VDC was the average VBAT [OV] measurement), 1 ms/div.
Turn on sources.
2. The input source has enough energy to charge the VSTOR up to the OV setting; and. when the boost
converter stops switching VSTOR will discharge down to the battery’s cell voltage which is ~3V which is
below the OV reset hysteresis. See Figure 7 for operation near OV. Note the hysteresis of VSTOR is
around 35mV here, but this can vary depending on the input, output voltage, the source and battery
impedance, and the number of pulses for each operation period of the boost converter.
Vstor
Vbat
Vin
Vphase
Figure 7. EVM Operation Near OV With 100-Ω Battery Impedance
10
bq25504 EVM – Ultra Low Power Boost Converter with Battery Management for SLUU654A – October 2011 – Revised October 2011
Energy Harvester Applications
Submit Documentation Feedback
Copyright © 2011, Texas Instruments Incorporated
PCB Layout Guideline
www.ti.com
4
PCB Layout Guideline
1. As with all switching power supplies, the layout is an important step in the design, especially at high
peak currents and high switching frequencies. If the layout is not carefully done, the boost
converter/charger could show stability problems as well as EMI problems. Therefore, use wide and
short traces for the main current path and for the power ground paths. The input and output capacitor,
as well as the inductor should be placed as close as possible to the IC.
2. The resistors that program the thresholds should be placed as close as possible to the input pins of the
IC to minimize parasitic capacitance to less than 2pF.
3. To lay out the ground, it is recommended to use short traces as well, separated from the power ground
traces. This avoids ground shift problems, which can occur due to superimposition of power ground
current and control ground current. Assure that the ground traces are connected close to the device
GND pins.
4. It is critical that the exposed thermal pad on the backside of the bq25504 package be soldered to the
PCB ground. Make sure there are sufficient thermal vias right underneath the IC, connecting to the
ground plane on the other layers.
5. Decoupling capacitors for VSTOR, VBAT should make the interconnections to the any Load as short
as possible.
6. EVM layout can be used as guidance though a smaller layout is achievable.
SLUU654A – October 2011 – Revised October 2011
Submit Documentation Feedback
bq25504 EVM – Ultra Low Power Boost Converter with Battery Management for
Energy Harvester Applications
Copyright © 2011, Texas Instruments Incorporated
11
Bill of Materials, Board Layout and Schematics
www.ti.com
5
Bill of Materials, Board Layout and Schematics
5.1
Bill of Materials
Table 2. Bill of Materials
Count
RefDes
Value
Description
Size
Part Number
MFR
2
C1, C2**
4.7uF
Capacitor, Ceramic, 10V, X5R, 10%
0805
GRM219R61A475KE19D
Murata
1
C3**
100uF
Capacitor, Ceramic, 6.3V, X5R, 20%
1812
GRM43SR60J107ME20L
Murata
2
C4, C6
0.1uF
Capacitor, Ceramic, 50V, X7R, 10%
0603
Std
Std
1
C5**
0.01uF
Capacitor, Ceramic, 50V, X7R, 10%
0603
GRM188R71H103KA01D
Murata
3
J1, J2, J5
ED555/2DS
Terminal Block, 2-pin, 6-A, 3.5mm
0.27 x 0.25
inch
ED555/2DS
OST
2
J3, J4
PEC02SAAN
Header, Male 2-pin, 100mil spacing,
0.100 inch x 2
PEC02SAAN
Sullins
1
J6
PEC03SAAN
Header, Male 3-pin, 100mil spacing,
0.100 inch x 3
PEC03SAAN
Sullins
2
JP1, JP2
PEC03SAAN
Header, Male 3-pin, 100mil spacing,
0.100 inch x 3
PEC03SAAN
Sullins
1
L1
22uH
Inductor, SMT, 0.8A, 360milliohm
0.153 x 0.153
inch
LPS4018-223MLB
Coilcraft
1
R1
10.0M
Resistor, Chip, 1/10W, 1%
0805
CRCW080510M0FKEA
Vishay
0
R11
Open
Resistor, Chip, 1/10W, 1%
0805
Std
Std
4
R12, R14, R15,
R16
0
Resistor, Chip, 1/10W, 1%
0805
Std
STD
0
R13, R17, R18
Open
Potentiometer, 1/4 in. Cermet, 12-Turn,
Top-Adjust
0.25x0.17
3266W-504LF
Bourns
3
R2, R6, R8
4.42M
Resistor, Chip, 1/10W, 1%
0805
CRCW08054M42FKEA
Vishay
1
R3
5.90M
Resistor, Chip, 1/10W, 1%
0805
CRCW08055M90FKEA
Vishay
1
R4
4.02M
Resistor, Chip, 1/10W, 1%
0805
CRCW08054M02FKEA
Vishay
2
R5, R10
5.60M
Resistor, Chip, 1/10W, 1%
0805
CRCW08055M60FKEA
Vishay
1
R7
1.43M
Resistor, Chip, 1/10W, 1%
0805
CRCW08051M43FKEA
Vishay
1
R9
4.22M
Resistor, Chip, 1/10W, 1%
0805
CRCW08054M22FKEA
Vishay
0
TP1, TP2, TP6,
TP7, TP8, TP9,
TP10, TP14,
TP16, TPG1,
TPG2, TPG3,
TPG4
Open
Test Point, O.032 Hole
STD
STD
1
U1
BQ25504RGT
IC, NanoAmpere Integrated Boost
Converter/Charger
BQ25504RGT
TI
1
--
PCB, 1.8 In x 1.8 In x 0.031 In
HPA674
Any
2
See Note 5
Shunt, 100-mil, Black
929950-00
3M
QFN-16
0.1
Notes: 1. These assemblies are ESD sensitive, ESD precautions shall be observed.
2. These assemblies must be clean and free from flux and all contaminants. Use of no clean flux is not acceptable.
3. These assemblies must comply with workmanship standards IPC-A-610 Class 2.
4. Ref designators marked with an asterisk ('**') cannot be substituted. All other components can be substituted with equivalent MFG's components.
5. Place shunt on JP1-2/3 (Divider) and JP2 (place on just one pin – ckt should be floating).
12
bq25504 EVM – Ultra Low Power Boost Converter with Battery Management for SLUU654A – October 2011 – Revised October 2011
Energy Harvester Applications
Submit Documentation Feedback
Copyright © 2011, Texas Instruments Incorporated
Bill of Materials, Board Layout and Schematics
www.ti.com
5.2
EVM Board Layout
TEXAS
INSTRUMENTS
Figure 8. EVM PCB Top Assembly
Figure 9. EVM PCB Top Layer
SLUU654A – October 2011 – Revised October 2011
Submit Documentation Feedback
bq25504 EVM – Ultra Low Power Boost Converter with Battery Management for
Energy Harvester Applications
Copyright © 2011, Texas Instruments Incorporated
13
Bill of Materials, Board Layout and Schematics
www.ti.com
Figure 10. EVM PCB Bottom Layer
14
bq25504 EVM – Ultra Low Power Boost Converter with Battery Management for SLUU654A – October 2011 – Revised October 2011
Energy Harvester Applications
Submit Documentation Feedback
Copyright © 2011, Texas Instruments Incorporated
Bill of Materials, Board Layout and Schematics
www.ti.com
5.3
EVM Schematic
Figure 11. EVM Schematic
SLUU654A – October 2011 – Revised October 2011
Submit Documentation Feedback
bq25504 EVM – Ultra Low Power Boost Converter with Battery Management for
Energy Harvester Applications
Copyright © 2011, Texas Instruments Incorporated
15
Evaluation Board/Kit Important Notice
Texas Instruments (TI) provides the enclosed product(s) under the following conditions:
This evaluation board/kit is intended for use for ENGINEERING DEVELOPMENT, DEMONSTRATION, OR EVALUATION
PURPOSES ONLY and is not considered by TI to be a finished end-product fit for general consumer use. Persons handling the
product(s) must have electronics training and observe good engineering practice standards. As such, the goods being provided are
not intended to be complete in terms of required design-, marketing-, and/or manufacturing-related protective considerations,
including product safety and environmental measures typically found in end products that incorporate such semiconductor
components or circuit boards. This evaluation board/kit does not fall within the scope of the European Union directives regarding
electromagnetic compatibility, restricted substances (RoHS), recycling (WEEE), FCC, CE or UL, and therefore may not meet the
technical requirements of these directives or other related directives.
Should this evaluation board/kit not meet the specifications indicated in the User’s Guide, the board/kit may be returned within 30
days from the date of delivery for a full refund. THE FOREGOING WARRANTY IS THE EXCLUSIVE WARRANTY MADE BY
SELLER TO BUYER AND IS IN LIEU OF ALL OTHER WARRANTIES, EXPRESSED, IMPLIED, OR STATUTORY, INCLUDING
ANY WARRANTY OF MERCHANTABILITY OR FITNESS FOR ANY PARTICULAR PURPOSE.
The user assumes all responsibility and liability for proper and safe handling of the goods. Further, the user indemnifies TI from all
claims arising from the handling or use of the goods. Due to the open construction of the product, it is the user’s responsibility to
take any and all appropriate precautions with regard to electrostatic discharge.
EXCEPT TO THE EXTENT OF THE INDEMNITY SET FORTH ABOVE, NEITHER PARTY SHALL BE LIABLE TO THE OTHER
FOR ANY INDIRECT, SPECIAL, INCIDENTAL, OR CONSEQUENTIAL DAMAGES.
TI currently deals with a variety of customers for products, and therefore our arrangement with the user is not exclusive.
TI assumes no liability for applications assistance, customer product design, software performance, or infringement of
patents or services described herein.
Please read the User’s Guide and, specifically, the Warnings and Restrictions notice in the User’s Guide prior to handling the
product. This notice contains important safety information about temperatures and voltages. For additional information on TI’s
environmental and/or safety programs, please contact the TI application engineer or visit www.ti.com/esh.
No license is granted under any patent right or other intellectual property right of TI covering or relating to any machine, process, or
combination in which such TI products or services might be or are used.
FCC Warning
This evaluation board/kit is intended for use for ENGINEERING DEVELOPMENT, DEMONSTRATION, OR EVALUATION
PURPOSES ONLY and is not considered by TI to be a finished end-product fit for general consumer use. It generates, uses, and
can radiate radio frequency energy and has not been tested for compliance with the limits of computing devices pursuant to part 15
of FCC rules, which are designed to provide reasonable protection against radio frequency interference. Operation of this
equipment in other environments may cause interference with radio communications, in which case the user at his own expense
will be required to take whatever measures may be required to correct this interference.
EVM Warnings and Restrictions
It is important to operate this EVM within the input voltage range of 0 V to 5.5 V and the output voltage range of 0 V to 5.5 V .
Exceeding the specified input range may cause unexpected operation and/or irreversible damage to the EVM. If there are
questions concerning the input range, please contact a TI field representative prior to connecting the input power.
Applying loads outside of the specified output range may result in unintended operation and/or possible permanent damage to the
EVM. Please consult the EVM User's Guide prior to connecting any load to the EVM output. If there is uncertainty as to the load
specification, please contact a TI field representative.
During normal operation, some circuit components may have case temperatures greater than 60°C. The EVM is designed to
operate properly with certain components above 105°C as long as the input and output ranges are maintained. These components
include but are not limited to linear regulators, switching transistors, pass transistors, and current sense resistors. These types of
devices can be identified using the EVM schematic located in the EVM User's Guide. When placing measurement probes near
these devices during operation, please be aware that these devices may be very warm to the touch.
Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265
Copyright © 2011, Texas Instruments Incorporated
IMPORTANT NOTICE
Texas Instruments Incorporated and its subsidiaries (TI) reserve the right to make corrections, modifications, enhancements, improvements,
and other changes to its products and services at any time and to discontinue any product or service without notice. Customers should
obtain the latest relevant information before placing orders and should verify that such information is current and complete. All products are
sold subject to TI’s terms and conditions of sale supplied at the time of order acknowledgment.
TI warrants performance of its hardware products to the specifications applicable at the time of sale in accordance with TI’s standard
warranty. Testing and other quality control techniques are used to the extent TI deems necessary to support this warranty. Except where
mandated by government requirements, testing of all parameters of each product is not necessarily performed.
TI assumes no liability for applications assistance or customer product design. Customers are responsible for their products and
applications using TI components. To minimize the risks associated with customer products and applications, customers should provide
adequate design and operating safeguards.
TI does not warrant or represent that any license, either express or implied, is granted under any TI patent right, copyright, mask work right,
or other TI intellectual property right relating to any combination, machine, or process in which TI products or services are used. Information
published by TI regarding third-party products or services does not constitute a license from TI to use such products or services or a
warranty or endorsement thereof. Use of such information may require a license from a third party under the patents or other intellectual
property of the third party, or a license from TI under the patents or other intellectual property of TI.
Reproduction of TI information in TI data books or data sheets is permissible only if reproduction is without alteration and is accompanied
by all associated warranties, conditions, limitations, and notices. Reproduction of this information with alteration is an unfair and deceptive
business practice. TI is not responsible or liable for such altered documentation. Information of third parties may be subject to additional
restrictions.
Resale of TI products or services with statements different from or beyond the parameters stated by TI for that product or service voids all
express and any implied warranties for the associated TI product or service and is an unfair and deceptive business practice. TI is not
responsible or liable for any such statements.
TI products are not authorized for use in safety-critical applications (such as life support) where a failure of the TI product would reasonably
be expected to cause severe personal injury or death, unless officers of the parties have executed an agreement specifically governing
such use. Buyers represent that they have all necessary expertise in the safety and regulatory ramifications of their applications, and
acknowledge and agree that they are solely responsible for all legal, regulatory and safety-related requirements concerning their products
and any use of TI products in such safety-critical applications, notwithstanding any applications-related information or support that may be
provided by TI. Further, Buyers must fully indemnify TI and its representatives against any damages arising out of the use of TI products in
such safety-critical applications.
TI products are neither designed nor intended for use in military/aerospace applications or environments unless the TI products are
specifically designated by TI as military-grade or "enhanced plastic." Only products designated by TI as military-grade meet military
specifications. Buyers acknowledge and agree that any such use of TI products which TI has not designated as military-grade is solely at
the Buyer's risk, and that they are solely responsible for compliance with all legal and regulatory requirements in connection with such use.
TI products are neither designed nor intended for use in automotive applications or environments unless the specific TI products are
designated by TI as compliant with ISO/TS 16949 requirements. Buyers acknowledge and agree that, if they use any non-designated
products in automotive applications, TI will not be responsible for any failure to meet such requirements.
Following are URLs where you can obtain information on other Texas Instruments products and application solutions:
Products
Applications
Audio
www.ti.com/audio
Communications and Telecom www.ti.com/communications
Amplifiers
amplifier.ti.com
Computers and Peripherals
www.ti.com/computers
Data Converters
dataconverter.ti.com
Consumer Electronics
www.ti.com/consumer-apps
DLP® Products
www.dlp.com
Energy and Lighting
www.ti.com/energy
DSP
dsp.ti.com
Industrial
www.ti.com/industrial
Clocks and Timers
www.ti.com/clocks
Medical
www.ti.com/medical
Interface
interface.ti.com
Security
www.ti.com/security
Logic
logic.ti.com
Space, Avionics and Defense
www.ti.com/space-avionics-defense
Power Mgmt
power.ti.com
Transportation and Automotive www.ti.com/automotive
Microcontrollers
microcontroller.ti.com
Video and Imaging
RFID
www.ti-rfid.com
OMAP Mobile Processors
www.ti.com/omap
Wireless Connectivity
www.ti.com/wirelessconnectivity
TI E2E Community Home Page
www.ti.com/video
e2e.ti.com
Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265
Copyright © 2011, Texas Instruments Incorporated