You are reminded not to ship the product identified under this PCN until released
by Semtech Corporation. A copy of their specific PCNs have been included with
this notification.
Please take action pursuant to your customer agreements and JEDEC 46.
PRODUCT / PROCESS CHANGE NOTIFICATION
PCN-000367
Date: 04/11/2016
P1/5
Semtech Corporation, 200 Flynn Road, Camarillo CA 93012
Semtech Canada Corporation, 4281 Harvester Road, Burlington, Ontario L7L 5M4 Canada
Semtech Irvine, 5141 California Ave., Suite 100, Irvine CA 92617
Semtech Neuchatel Sarl, Route des Gouttes d’Or 40, CH-2000 Neuchatel Switzerland
Nanotech Semiconductor, Semtech Corporation, 2 West Point Court, Bristol, United Kingdom, BS32 4PY
Semtech Corpus Christi SA de CV, Carretera Matamorros Edificio 7, Reynosa, Tamaulipas, Mexico 88780
Semtech Triune, 1101 Resource Drive, Suite 121, Plano TX 75074
Change Details
Part Number(s) Affected:
Customer Part Number(s) Affected:
N/A
SC4215I / SC4215H / SC4215A
SC4216 / SC4216H
SC4211 / SX1241 / SC2620
SC4525A / SC4525C / SC4524C /
SC4525B / SC4525D / SC4525E /
SC4525F
SC4519H / SC4519S / SC4518
SC4521 / SC2595 / SC2596 /
SC1592
SC1211S / SC4250L
Description, Purpose and Effect of Change:
1) Ablestik/Henkel produces ABP2600AT HT epoxy. Their supplier discontinued one
of the raw materials in the formulation. Ablestik has issued an EOL notification to
all of their customers. Semtech’s supplier, Cirtek is affected. Product assembled
at Cirtek are identified and impacted by this change.
2) The replacement epoxy for the 2600AT epoxy for SOIC-EP is ABP8060T. It passed
qualification testing at Cirtek and Semtech. The thermal performance of ABP8060T
is equivalent to the 2600AT epoxy.
3) Semtech has completed reliability testing of this change and it meets Semtech’s
reliability requirements and meets JEDEC guidelines.
4) The short implementation time is due to the limited and short supply of existing
Ablestik 2600AT epoxy.
Change Classification
Impact to Data Sheet
Major
Yes
Minor
No
Impact to Form, Fit,
Function
Yes
New Revision or Date
No
N/A
Impact to Performance, Characteristics or Reliability:
No Impact to product form, fit, function, quality, application, performance,
characteristics or reliability.
No Change to data sheet content or package dimensions.
Semtech Corporation • 200 Flynn Road • Camarillo • Ca • 93012 • Phone +1 (805) 498-2111
CONFIDENTIAL
DO NOT DUPLICATE
PRODUCT / PROCESS CHANGE NOTIFICATION
PCN-000367
Date: 04/11/2016
Implementation Date
09/30/2016
Last Time Ship (LTS)
09/30/2016
Of unchanged product
Sample Availability
Yes
Work Week
Affecting Lot No. /
Serial No. (SN)
Qualification Report
Availability
P2/5
1640
N/A
Included with PCN
Supporting Documents for Change Validation/Attachments:
Ablestik Technical Data Sheet; ABLETHERM 2600AT-EN
Loctite Technical Data sheet; ABLESTIK ABP 8060T-EN
Ablestik ABP 8060T RoHS, Halogen and Sb environmental SGS reports
Ablestik ABP 8060T Qualification Report
Semtech Business Unit:
Semtech Contact Info:
Issuing Authority
Power Management
Randy Biddle
Engineer Sr., Product Quality
Semtech Corporation
1101 Resource Dr. Suite 121
Plano, Texas 75074
rbiddle@semtech.com
Voice: (469) 277-6078
Cell: (805) 377-7747
FOR FURTHER INFORMATION & WORLDWIDE SALES COVERAGE:
http://www.semtech.com/contact/index.html#support
Semtech Corporation • 200 Flynn Road • Camarillo • Ca • 93012 • Phone +1 (805) 498-2111
CONFIDENTIAL
DO NOT DUPLICATE
PRODUCT / PROCESS CHANGE NOTIFICATION
PCN-000367
Date: 04/11/2016
P3/5
Semtech Corporation • 200 Flynn Road • Camarillo • Ca • 93012 • Phone +1 (805) 498-2111
CONFIDENTIAL
DO NOT DUPLICATE
PRODUCT / PROCESS CHANGE NOTIFICATION
PCN-000367
Date: 04/11/2016
P4/5
Semtech Corporation • 200 Flynn Road • Camarillo • Ca • 93012 • Phone +1 (805) 498-2111
CONFIDENTIAL
DO NOT DUPLICATE
PRODUCT / PROCESS CHANGE NOTIFICATION
PCN-000367
Date: 04/11/2016
P5/5
Semtech Corporation • 200 Flynn Road • Camarillo • Ca • 93012 • Phone +1 (805) 498-2111
CONFIDENTIAL
DO NOT DUPLICATE
Rel Job Detail Report
Businessunit
Reljob#
Power Management
Part_Number, Job Name/Type
6056
by Sublot, by Sequence
Contact: Gurmail Sajjan
(805) 480 2142
gsajjan@semtech.com
Fab, Package
Rel Job Status
SC2596 / SC4524C / SC4215H
Key Dates:
Job Accepted: 01-Sep-2015
Rel Testing Complete
Passes All Requirements
Cirtek SOIC ABP8060T Epoxy Qualification
SOIC
Actual Start Date: 06-Oct-2015
Misc Rel Job
Requested CD:
ECD for Conditional:
Job ECD: 03-Dec-2015
Completed Tasks
1.0
Lot
JA69458.15
AssemblyLot
Seq TaskCode
DateCode
AER-002786B
SampleSize
Criteria
1535
Complete Failures
DataSource Results/Comments
1 Data-Prep
None
None
06-Oct-2015
0
Camarillo
2 HTOL_Pre_Elect
35
Pass on Zero Fails
09-Oct-2015
0
Camarillo
3 BI_BD_Valid
NA
Meet HTOL
Schematics
09-Oct-2015
0
Camarillo
4 HTOL_125°C_0168
35
Pass on Zero Fails
16-Oct-2015
0
Camarillo
5 HTOL_125°C_1000
35
Pass on Zero Fails
20-Nov-2015
0
Camarillo
6 HTS_Pre_Elect
77
Pass on Zero Fails
09-Oct-2015
0
Camarillo
7 HTS_0250
77
Pass on Zero Fails
19-Oct-2015
0
Camarillo
8 HTS_1000
77
Pass on Zero Fails
20-Nov-2015
0
Camarillo
9 Pre_Conditioning_Level_1
NA
MSL 1
01-Oct-2015
0
Camarillo
10 Pre_Elect_Precond
77
Pass on Zero Fails
13-Oct-2015
0
Camarillo
11 CSAM Analysis
22
Pass on Zero Fails
14-Oct-2015
0
Camarillo
12 Precond_Temp_Cyc_5cyc
77
Pass on Zero Fails
14-Oct-2015
0
Camarillo
13 Precond_HTS_24hr
77
Pass on Zero Fails
15-Oct-2015
0
Camarillo
14 Precond_85/85_NoElec168hr
77
Pass on Zero Fails
22-Oct-2015
0
Camarillo
15 Precond_260°C_IR_Ref_Char
77
Pass on Zero Fails
22-Oct-2015
0
Camarillo
Monday, March 14, 2016
Page 1 of 5
Rel Job Detail Report
2.0
16 CSAM Analysis
22
Pass on Zero Fails
26-Oct-2015
0
Camarillo
17 T/C_Pre_Elect
77
Pass on Zero Fails
29-Oct-2015
0
Camarillo
18 T/C_wPre_0250
76
Pass on Zero Fails
03-Nov-2015
0
Camarillo
19 T/C_wPre_0500
76
Pass on Zero Fails
09-Nov-2015
0
Camarillo
20 T/C_wPre_1000
76
Pass on Zero Fails
19-Nov-2015
0
Camarillo
21 CSAM Analysis
22
Pass on Zero Fails
23-Nov-2015
0
Camarillo
22 Pre_Elect_Precond
77
Pass on Zero Fails
13-Oct-2015
0
Camarillo
23 CSAM Analysis
22
Pass on Zero Fails
14-Oct-2015
0
Camarillo
24 Precond_Temp_Cyc_5cyc
77
Pass on Zero Fails
14-Oct-2015
0
Camarillo
25 Precond_HTS_24hr
77
Pass on Zero Fails
15-Oct-2015
0
Camarillo
26 Precond_85/85_NoElec168hr
77
Pass on Zero Fails
22-Oct-2015
0
Camarillo
27 Precond_260°C_IR_Ref_Char
77
Pass on Zero Fails
22-Oct-2015
0
Camarillo
28 CSAM Analysis
22
Pass on Zero Fails
26-Oct-2015
0
Camarillo
29 HAST Pre_Elect
77
Pass on Zero Fails
29-Oct-2015
0
Camarillo
30 HAST_BD_Validation
N/A
Pass on Zero Fails
17-Nov-2015
0
Camarillo
31 HAST_wPRE_264 Hrs 110°C
77
Pass on Zero Fails
30-Nov-2015
0
Camarillo
32 HAST_Post_Elect_room
77
Pass on Zero Fails
01-Dec-2015
0
Camarillo
33 CSAM Analysis
22
Pass on Zero Fails
03-Dec-2015
0
Camarillo
34 Pack_Clos
0
0
03-Dec-2015
0
Camarillo
Lot
GE57270
Seq TaskCode
AssemblyLot
DateCode
AER-002787B
SampleSize
Criteria
Complete Failures
DataSource Results/Comments
1 Data-Prep
None
None
08-Oct-2015
0
Camarillo
2 HTOL_Pre_Elect
35
Pass on Zero Fails
09-Oct-2015
0
Camarillo
3 BI_BD_Valid
NA
Meet HTOL
Schematics
13-Oct-2015
0
Camarillo
4 HTOL_125°C_0168
35
Pass on Zero Fails
21-Oct-2015
0
Camarillo
5 HTOL_125°C_1000
35
Pass on Zero Fails
24-Nov-2015
0
Camarillo
6 HTS_Pre_Elect
35
Pass on Zero Fails
07-Oct-2015
0
Camarillo
Monday, March 14, 2016
by Sublot, by Sequence
Contact: Gurmail Sajjan
(805) 480 2142
gsajjan@semtech.com
Page 2 of 5
Rel Job Detail Report
7 HTS_0250
35
Pass on Zero Fails
21-Oct-2015
0
Camarillo
8 HTS_1000
35
Pass on Zero Fails
19-Nov-2015
0
Camarillo
9 Pre_Conditioning_Level_1
NA
MSL 1
01-Oct-2015
0
Camarillo
10 Pre_Elect_Precond
77
Pass on Zero Fails
13-Oct-2015
0
Camarillo
11 CSAM Analysis
22
Pass on Zero Fails
14-Oct-2015
0
Camarillo
12 Precond_Temp_Cyc_5cyc
77
Pass on Zero Fails
14-Oct-2015
0
Camarillo
13 Precond_HTS_24hr
77
Pass on Zero Fails
15-Oct-2015
0
Camarillo
14 Precond_85/85_NoElec168hr
77
Pass on Zero Fails
23-Oct-2015
0
Camarillo
15 Precond_260°C_IR_Ref_Char
77
Pass on Zero Fails
23-Oct-2015
0
Camarillo
16 CSAM Analysis
22
Pass on Zero Fails
23-Oct-2015
0
Camarillo
17 T/C_Pre_Elect
77
Pass on Zero Fails
27-Oct-2015
0
Camarillo
19 T/C_wPre_0500
77
Pass on Zero Fails
09-Nov-2015
0
Camarillo
20 T/C_wPre_1000
77
Pass on Zero Fails
17-Nov-2015
0
Camarillo
21 CSAM Analysis
22
Pass on Zero Fails
18-Nov-2015
0
Camarillo
22 Pre_Elect_Precond
77
Pass on Zero Fails
13-Oct-2015
0
Camarillo
23 CSAM Analysis
22
Pass on Zero Fails
14-Oct-2015
0
Camarillo
24 Precond_Temp_Cyc_5cyc
77
Pass on Zero Fails
14-Oct-2015
0
Camarillo
25 Precond_HTS_24hr
77
Pass on Zero Fails
15-Oct-2015
0
Camarillo
26 Precond_85/85_NoElec168hr
77
Pass on Zero Fails
23-Oct-2015
0
Camarillo
27 Precond_260°C_IR_Ref_Char
77
Pass on Zero Fails
23-Oct-2015
0
Camarillo
28 CSAM Analysis
22
Pass on Zero Fails
23-Oct-2015
0
Camarillo
29 HAST Pre_Elect
77
Pass on Zero Fails
28-Oct-2015
0
Camarillo
30 HAST_BD_Validation
N/A
Pass on Zero Fails
29-Oct-2015
0
Camarillo
31 HAST_wPRE_264 Hrs 110°C
77
Pass on Zero Fails
04-Nov-2015
0
Camarillo
32 HAST_Post_Elect_room
77
Pass on Zero Fails
17-Nov-2015
0
Camarillo
33 CSAM Analysis
22
Pass on Zero Fails
18-Nov-2015
0
Camarillo
34 Pack_Clos
0
0
25-Nov-2015
0
Camarillo
Monday, March 14, 2016
by Sublot, by Sequence
Contact: Gurmail Sajjan
(805) 480 2142
gsajjan@semtech.com
Page 3 of 5
Rel Job Detail Report
3.0
Lot
6635250
AssemblyLot
Seq TaskCode
DateCode
AER-002784B
SampleSize
Criteria
Complete Failures
DataSource Results/Comments
1 Data-Prep
None
None
01-Oct-2015
0
Camarillo
2 HTOL_Pre_Elect
35
Pass on Zero Fails
05-Oct-2015
0
Camarillo
3 BI_BD_Valid
NA
Meet HTOL
Schematics
08-Oct-2015
0
Camarillo
4 HTOL_125°C_0168
35
Pass on Zero Fails
16-Oct-2015
0
Camarillo
5 HTOL_125°C_1000
35
Pass on Zero Fails
20-Nov-2015
0
Camarillo
6 HTS_Pre_Elect
77
Pass on Zero Fails
05-Oct-2015
0
Camarillo
7 HTS_0250
77
Pass on Zero Fails
19-Oct-2015
0
Camarillo
8 HTS_1000
77
Pass on Zero Fails
16-Nov-2015
0
Camarillo
9 Pre_Conditioning_Level_1
NA
MSL 1
01-Oct-2015
0
Camarillo
10 Pre_Elect_Precond
77
Pass on Zero Fails
05-Oct-2015
0
Camarillo
11 CSAM Analysis
22
Pass on Zero Fails
06-Oct-2015
0
Camarillo
12 Precond_Temp_Cyc_5cyc
77
Pass on Zero Fails
06-Oct-2015
0
Camarillo
13 Precond_HTS_24hr
77
Pass on Zero Fails
07-Oct-2015
0
Camarillo
14 Precond_85/85_NoElec168hr
77
Pass on Zero Fails
14-Oct-2015
0
Camarillo
15 Precond_260°C_IR_Ref_Char
77
Pass on Zero Fails
14-Oct-2015
0
Camarillo
16 CSAM Analysis
22
Pass on Zero Fails
15-Oct-2015
0
Camarillo
17 T/C_Pre_Elect
77
Pass on Zero Fails
19-Oct-2015
0
Camarillo
18 T/C_wPre_0250
77
Pass on Zero Fails
26-Oct-2015
0
Camarillo
19 T/C_wPre_0500
77
Pass on Zero Fails
02-Nov-2015
0
Camarillo
20 T/C_wPre_1000
77
Pass on Zero Fails
09-Nov-2015
0
Camarillo
21 CSAM Analysis
22
Pass on Zero Fails
12-Nov-2015
0
Camarillo
22 Pre_Elect_Precond
77
Pass on Zero Fails
05-Oct-2015
0
Camarillo
23 CSAM Analysis
22
Pass on Zero Fails
06-Oct-2015
0
Camarillo
24 Precond_Temp_Cyc_5cyc
77
Pass on Zero Fails
06-Oct-2015
0
Camarillo
25 Precond_HTS_24hr
77
Pass on Zero Fails
07-Oct-2015
0
Camarillo
Monday, March 14, 2016
by Sublot, by Sequence
Contact: Gurmail Sajjan
(805) 480 2142
gsajjan@semtech.com
Page 4 of 5
Rel Job Detail Report
26 Precond_85/85_NoElec168hr
77
Pass on Zero Fails
14-Oct-2015
0
Camarillo
27 Precond_260°C_IR_Ref_Char
77
Pass on Zero Fails
14-Oct-2015
0
Camarillo
28 CSAM Analysis
22
Pass on Zero Fails
15-Oct-2015
0
Camarillo
29 HAST Pre_Elect
77
Pass on Zero Fails
19-Oct-2015
0
Camarillo
30 HAST_BD_Validation
N/A
Pass on Zero Fails
20-Oct-2015
0
Camarillo
31 HAST_wPRE_264 Hrs 110°C
77
Pass on Zero Fails
04-Nov-2015
0
Camarillo
32 HAST_Post_Elect_room
77
Pass on Zero Fails
05-Nov-2015
0
Camarillo
33 CSAM Analysis
22
Pass on Zero Fails
06-Nov-2015
0
Camarillo
34 Pack_Clos
0
0
20-Nov-2015
0
Camarillo
Monday, March 14, 2016
by Sublot, by Sequence
Contact: Gurmail Sajjan
(805) 480 2142
gsajjan@semtech.com
Page 5 of 5