0
登录后你可以
  • 下载海量资料
  • 学习在线课程
  • 观看技术视频
  • 写文章/发帖/加入社区
创作中心
发布
  • 发文章

  • 发资料

  • 发帖

  • 提问

  • 发视频

创作活动
0622025210

0622025210

  • 厂商:

    MOLEX10(莫仕)

  • 封装:

    -

  • 描述:

    EXTRACT TOOL 2X1 ZQSFP+

  • 数据手册
  • 价格&库存
0622025210 数据手册
zQSFP+ Multi-Port Connector Tooling 2-by-1 zQSFP+ Extraction Tool Application Tooling Specification Sheet Order No. 62202-5210 FEATURES Used for removal of a zQSFP+ assembly from a PCB Removes connector from the PCB without damage to the board Use tool 62202-5250 to insert 170879-10** series assemblies Use tool 62202-5320 to insert 170879-30** series assemblies SCOPE Products: zQuad Small Form-Factor Pluggable Plus (zQSFP+) Cage Assembly, with Elastomeric Gasket or Metal EMI Gasket, 2-by-1 Enhanced EMI Cage Construction. Connector Series No. Connector Order No. 170879 170879-1001 170879-1002 170879-1003 170879-1010 170879-3001 173604 173604-0001 170879-3002 170879-3003 Notes: 1. See the following pages for tooling operation instructions. 2. These tools require a “Keep Out Zone” around the connector free of components. The right and left sides should be .138” (3.5mm). See Figure 1. 170879-3000 zQSFP+ CONNECTOR ASSEMBLY 170879-1001 zQSFP+ CONNECTOR ASSEMBLY 5.0mm MINIMUM PCB 5.0mm MINIMUM PCB 3.5mm MINIMUM (BOTH SIDES) KEEP OUT ZONE KEEP OUT ZONE 3.5mm MINIMUM (BOTH SIDES) 170879-1010 zQSFP+ CONNECTOR ASSEMBLY 5.0mm MINIMUM PCB KEEP OUT ZONE Figure 1 3.5mm MINIMUM (BOTH SIDES) Doc. No: ATS-622025210 Revision: C Release Date: 09-20-13 Revision Date: 04-21-17 UNCONTROLLED COPY Page 1 of 3 zQSFP+ Multi-Port Connector Tooling SUPPORT LOCK (INSERT) REMOVE THE SCREWS AND WASHERS PCB CONNECTOR ASSEMBLY SLIDE UP SLIDE REMOVE UPPER TOOLING SUPPORT BLOCK (FULLY SEATED) SUPPORT TOOLING Figure 3 Figure 2 CONNECTOR ASSEMBLY Description The following Instructions are used for removing a 2-by-1 connector from a PCB. Operation 1. Disassemble the (2) halves by unscrewing the screws on the top of the upper tooling. See Figure 2. 2. Remove the upper tooling from the support tooling. 3. Insert the support tooling into the cage ports until it is fully seated. See Figure 3. 4. Place the top removal assembly over the support tooling and the cage assembly, aligning the screw holes of the top removal assembly with the threaded holes in the support blocks. See Figure 4. 5. If the top removal assembly does not fit over the cage, the side supports of the top assembly can be adjusted farther from the cage sides. 6. Place the washers and M5 screws into the holes in the top removal assembly; turn the screws clockwise until they are started in the support blocks. SCREWS AND WASHERS TOP REMOVAL ASSEMBLY SUPPORT TOOLING PCB Figure 4 Doc. No: ATS-622025210 Revision: C Release Date: 09-20-13 Revision Date: 04-21-17 UNCONTROLLED COPY Page 2 of 3 zQSFP+ Multi-Port Connector Tooling 7. Using a 4mm hex wrench, tighten each screw, one turn in an alternating pattern until the cage assembly is removed from the PCB. See Figure 5. SUPPORT TOOLING PCB PCB CONNECTOR ASSEMBLY CONNECTOR ASSEMBLY REMOVED Figure 5 CAUTION: Molex application tooling specifications are valid only when used with Molex connectors and tooling. Application Tooling Support Phone: +1-402-458-TOOL (8665) E-Mail: applicationtooling@molex.com Website: www.molex.com/applicationtooling Molex is a registered trademark of Molex, LLC in the United States of America and may be registered in other countries; all other trademarks listed herein belong to their respective owners. Doc. No: ATS-622025210 Revision: C Release Date: 09-20-13 Revision Date: 04-21-17 UNCONTROLLED COPY Page 3 of 3
0622025210 价格&库存

很抱歉,暂时无法提供与“0622025210”相匹配的价格&库存,您可以联系我们找货

免费人工找货