Test Procedure for the NCP170AXV360GEVB Evaluation Board
Test procedure:
1.Check the position of jumper and correct this if necesary in acordance with the picture above.
2. Connect the test setup as shown Figure above
3. Appy an input voltage Vin = 4.6 V
4. Appy Iout = 0mA load.
5. Check that Vout is 3.6 V +/-1%.
6. Increase Iout up to 0.15 A
7. Check that Vout is 3.6 V +/-1%.
7. Increase Vin up to 5.5 V and decrease the load in accordance with SOA
8. Power down the Load
9. Power down the Vcc
10. End of test
11/10/15
1
www.onsemi.com
很抱歉,暂时无法提供与“NCP170AXV360GEVB”相匹配的价格&库存,您可以联系我们找货
免费人工找货