IP66 Instruction Data | 550B-1
Outdoor Pushbutton Timer
energystandard
Pushbutton Timer Delay Switch – Three Wire (L in-L out-N). For all load types
Features
Time Delay: 2min-1hr
Voltage: 240Va.c. 50Hz
Load Rating & Type: 10A for all electrical
load types including lighting loads that are
LED, Compact Fluorescent and Fluorescent,
Incandescent and Resistive. This switch can
also switch contactors provided a capacitor
is fitted across the coil.
IP rating: IP66
Fitting and operation instructions
This product can ONLY be used with the back box
supplied and can be used in outdoor and bathroom
applications. Failure to use the back box provided
will invalidate the warranty. It is essential that that
the correct IP66 rated connections are made to
keep the IP66 rating of the back box maintained.
1. Take the surface mount box and remove
knockouts as required. Ideally remove with a hole
saw for cleanest effect and remove any burrs.
Drill a small 3mm drain hole at the back of the box
in the position marked‘ DRAIN‘. Drill outwards
from the inside of the box.
2. Mount the surface mount box on a secure surface
using the mounting pack supplied. Place screw
cover seal over the rear mounting screws after
screwing the box to the wall.
3. It is essential to maintain the IP rating with all
connections to the box. Please use a suitable M20
cable gland and use appropriate sealing washers.
For steel wired armoured connections to the box
use a nylon 20mm seal to maintain IP rating.
Seals have been provided for your convenience.
4. Prior to fitting ensure mains power is switched
OFF and live in, live out and neutral wires are
identified. Where applicable remove metal back box
lugs that are not being used.
5. Securely fit live in, live out and neutral wires into
terminals marked Lin, Lout & N.
6. Turn mains power ON. Put the product in 10-15
second test mode.
7. Press the Elkay Push Button timer button to
switch the load ON. The Elkay Push Button timer will
turn the Load OFF automatically once the required
time delay selected has elapsed.
8. The Timer can also act as an on/off switch. Press
to turn switch ON and to turn OFF simply press and
hold the timer button for 3 seconds and the load will
switch off immediately.
9. Set the required time delay with reference to
Timing Diagram.
10. Once the installation is fully tested and working
as required ensure the timer is secured to the back box.
11. A capacitor will be required when switching low
power or low energy lighting. For example: LED, 2-D
fittings, energy saving lamps, etc. One capacitor per
circuit must be fitted at the light fitting. Elkay
Capacitor Product Code PFCC-1.
AREA OF LOW
SENSITIVITY
Timing Diagram
20mins
1.
25 mins
2.
1.
30 mins
35 mins
1.
7 mins
4.
3.
2.
1.
40 mins
3.
2.
1.
10 mins
4.
3.
2.
1.
45 mins
DIP
DIP
4.
ON
2.
ON
DIP
ON
DIP
ON
DIP
5 mins
3.
4.
3.
2.
1.
15 mins
4.
3.
2.
1.
50 mins
DIP
3.
1.
4.
ON
2.
4.
2.
DIP
3.
3.
DIP
4.
4 mins
DIP
3 mins
ON
DIP
DIP
ON
1.
4.
ON
1.
2.
ON
2.
2 mins
3.
ON
3.
1.
4.
DIP
4.
2.
ON
ON
DIP
10-15 sec
Test mode
3.
DIP
1.
4.
ON
2.
ON
3.
DIP
4.
ON
ON
DIP
Please note that the black bar denotes the position of the dip switch
4.
3.
2.
1.
60 mins
Wiring Diagram
Single switching
N SL L
Multiple switching
LIVE IN
NEUTRAL
LIVE IN
NEUTRAL
LIVE OUT
LIVE OUT
N SL L
N SL L
N SL L
IMPORTANT NOTICE All wiring should be carried out by a competent person or qualified electrician and be fitted to
current IEE Edition wiring regulations.
RPM-490
UK Head Office, Station Road. Coleshill, Birmingham B46 1HT
Tel: +44 (0) 1675 468 222 Fax: +44 (0) 1675 464 930
www.elkay.co.uk
The Company‘s policy is one of continuous improvement and reserves
the right to change specifications at any time without prior notice.
很抱歉,暂时无法提供与“550B-1”相匹配的价格&库存,您可以联系我们找货
免费人工找货