ams AG
Tobelbader Strasse 30
8141 Unterpremstaetten
Austria
T +43 3136 500-0
F +43 3136 525-01
info@ams.com
www.ams.com
Unterpremstätten, July 17, 2014
Process Change Notification PCN18-2014
Installation of improved fab metallization process for 0.35 µm technologies
Dear Customer,
AMS management team decided to take the next step in the roadmap towards advanced technology nodes.
Within the next year 0.18µm technology will be ramped up in Fab B. This offers the possibility to reengineer
and improve installed process steps.
Therefore, please be informed that ams will modify Fab B 0.35µm metallization processes towards improved
single process steps established in semiconductor industry for advanced technologies already for years.
The modified process combines following single process steps:
•
tungsten CMP replaces tungsten etchback process
•
decreasing of aluminium metallization deposition temperature from 300°C to 200°C
•
adaption of ARC layer for new aluminium metallization
These changes are applicable to all metal layers.
Products affected:
Please refer to product list on page 6
Bankverbindungen/
Bankaccounts
UniCredit Bank Austria AG, Graz
IBAN EUR AT28 1200 0763 1316 1100
BIC BKAUATWW
IBAN USD AT60 1200 0763 1316 1106
BIC BKAUATWW
Firmenbuchgericht Graz
Firmenbuch Nr. FN 34109k
DVR 0420352
UID/VAT ATU 28560205
Purpose of Change:
The installation of enhanced single processes as part of ramp up of 0.18µm technology in Fab B
enables the improvement of established 0.35µm technology. Already established process moduls in
Fab B will be roled out to less advanced 0.35µm technology node at ams.
The applied changes are triggered by continuous improvements towards lower defect density and
higher yield. Furthermore the changes increase process robustness and manufacturability due to
better layer uniformity.
The new processes will provide additional flexibility and capacity to further improve responsiveness
and on time delivery to ams customers.
Single Process Changes:
See detailed information in appendix
Qualification Strategy:
ams is qualifying process change based on established change management flow including safe
launch phase.
The qualification includes:
Inline and defect data review
Wafer acceptance test
Waferprobetest results
Process reliability (electromicration) – three lot qualification
Product reliability test (HTOL) - three lot qualification
Detailed qualification results can be provided upon request.
Target Date of Implementation:
September 2014
Sample Availability:
Sample availability has to be aligned
page 2/6
Risk Assessment:
The risk is classified as low based on following facts:
•
State of the art metalization scheme for advanced process nodes
•
Improved topography / layer uniformity - no plug recess
•
Reduced defect density / higher yield
•
Metallization and interconnect qualification, see above
•
Process and line control via established fault detection and classification (FDC)
system, reliability monitoring and MRB approach
Detailed risk assessment is covered by updated process FMEA.
Please be advised that unless we receive your written refusal concerning this PCN within 30 days, the PCN
shall be deemed accepted.
If you do have further questions, please do not hesitate to contact us.
Best Regards,
Udo Theißl
ams AG
QC Manager
Appendix:
Detailed information:
Process comparison:
OLD PROCESS
contact
Contact/via formation
liner
Liner deposition
WxD
Tungsten deposition
Tungsten etch back
MxD
Metal deposition
Arc layer
NEW PROCESS
contact
liner
WxD
CMP
Ti/TiN
MxD
Contact/via formation
Liner deposition
Tungsten deposition
Tungsten CMP
Ti / TiN Redeposition
Metal deposition
Arc layer
page 3/6
Metallization and interconnect – schematic
Old process:
New process:
page 4/6
X-Section: STEM
Old Process:
New process:
page 5/6
Products affected:
AS1122 x
AS2522x
AS2523x
AS3421x
AS3422x
AS3728x
AS3820x
AS3821x
AS3822x
AS3823x
AS3910x
AS3911x
AS3922x
AS5013x
AS5600x
page 6/6
很抱歉,暂时无法提供与“AS3823-ZTQT”相匹配的价格&库存,您可以联系我们找货
免费人工找货