Fiber Distribution Box
Assembly Instructions
1.
Loosen the screw keeping the
door closed and open the distribution
box by carefully lifting open the clips.
Make sure that the cable grommets are
facing toward you.
2.
Carefully unclip the splice tray
and open it completely. Unscrew and
remove all of the cable tie-downs.
3.
Remove the cable grommet with
the large opening from the distribution
box. Use a utility knife to cut the scored
"X" to help pass the cable into the box.
4.
Measure 27-inches from the end
of the cable an make a mark with a black
marker. Feed the grommet over the cable
beyond the mark on the cable jacket.
5.
Remove the jacket at the mark
and cut off the aramid fiber.
6.
Wrap electrical tape around the
cable where the cable clamps are located
to ensure a secure fit. Make sure the
grommet is fit into the body of the
distribution box.
7.
Reinstall the cable clamps for
the distribution cable and verify the
cable is secure.
8.
Using a flathead screwdriver,
carefully pry upward between the hinge
of the splice tray to remove it from the
distribution box. Remove the clear cover
of the splice tray.
9.
Feed the fibers around the outer
oval of the splice tray.
www.tlnetworx.com
Fiber Distribution Box
Assembly Instructions
10.
Flip the splice tray over and
remove the cable "T" under the hinged
area of the splice tray and the top of the
distribution box.
11.
Lay the fiber ends between the
edge of the distribution box and the base
of the cable "T" under the splice tray,
then reinstall the "T" top. Terminate the
fibers as needed.
12.
Remove the patch cable grommet from the bottom of the distribution
box. Insert a fiber optic coupler into the
base of the distribution box and connect
the patch cable into the coupler.
13.
Plug the connectors from the
distribution cable into the appropriate
fiber optic coupler. Any unused fibers
can be routed to the side the box for
future use. Reinstall the cable "T" at the
top end of the distribution box.
14.
Use a utility knife to open the
bottom of the grommet to accommodate
the patch cables.
15.
Feed the patch cables into the
bottom of the grommet. Reinstall the
grommet into the bottom of the distribution box. Make sure each strand of the
patch cables fit in a single spot within the
cable clamp area.
16.
Reinstall the cable clamp for the
patch cables. Carefully Reinstall the
splice tray in the hinge locations.
17.
Secure the splice tray onto the
locking clip. Replace the splice tray
cover.
18.
Close the distribution box
making sure there is an audible click
from the side clips. Secure the box with
the security hex bolt. Mound the box
onto the wall.
www.tlnetworx.com